Tailings dumps and reef ground near Nyatike
120 hectares combining historic tailings dumps and an untested reef, offered as a joint venture for a partner with processing capacity.
Joint venture
On application
Gold grade analysis
Moderate grade- Average
- 2.19 ppm Au
- Median
- 1.42 ppm Au
- Highest
- 4.20 ppm Au
- Lowest
- 0.96 ppm Au
Based on lab assays that Aurelot checked against the original certificates. 3 of 3 samples used · 3 lab assays · 3 verified.
1 ppm = 1 gram of gold per tonne (g/t). Sample averages are not a mineral resource or reserve estimate.
Every sample
All readings converted to ppm (g/t), with the value as the lab or field instrument reported it.
| Sample | Type | Method | Au (ppm) | As reported | Depth | Lab and date | Certificate |
|---|---|---|---|---|---|---|---|
| NY-R01 | Channel | Fire assay (lab) | 4.20 | 4.2 g/t | 8 m | Demo Assay Lab, Nairobi · 20 May 2026 | None |
| NY-T01 | Tailings | Fire assay (lab) | 1.42 | 1.42 g/t | 2 m | Demo Assay Lab, Nairobi · 18 May 2026 | None |
| NY-T02 | Tailings | Fire assay (lab) | 0.96 | 0.96 g/t | 2 m | Demo Assay Lab, Nairobi · 18 May 2026 | None |
About this plot
Demo listing. This plot shows how listings work on Aurelot. It is not a real offer, and the samples, licence and price are illustrative.
The ground holds two old tailings dumps left by earlier small-scale processing, plus a reef that was never mined below 10 m. It suits a partner who can bring a carbon-in-leach or gravity plant.
Best gold results
- 1.42 g/t Au average of tailings auger samples from dump A
- 0.96 g/t Au average of tailings auger samples from dump B
- 4.20 g/t Au channel sample across the reef at 8 m
The holder is open to a joint venture where the partner funds processing and earns a share of production.